March 2023
the outside patio
frames
On the 16th of March I got in touch with Yolanda at Herni asking if they’d be coming the next week because we’d already reached the 6-week period. She got back to me asking if they could come the same day to install the frames. I gave her a one-word answer: ¡Si!
So 2 people from Herni arrived shortly after this and during the next 2 hours fitted the 4 frames, 3 for the side near the front door and the big one for the window towards the main gate.
And the next, and last, bit in this story is the outside patio, glass.